Saturday, January 23, 2010

Stressful Moments

I am so freaking busy processing orders and one big order took me 2 days to finished. I am having a hard time processing orders because my space at home is so small. Some of the ingredients are inside my room and some are in the basement and sometimes I have to use the stove which is located on the main floor of my house. I am thinking of putting everything in the basement, including my computer so I don't have to go up and down when I have orders. But then, we are purchasing a house so I thought of setting aside on putting everything in my basement and just wait until we move.

The inspector of the house found some electrical problems in the house so we are still negotiating. Even if the seller fix those minor problems themselves, I am still thinking of hiring an electrical contractor to fix the elctrical problems to be safe. I just need to find out how much will it cost.

It's an old house so I dont expect everything to be perfect, but this issue is a safety hazard so I still need to figure things out.

I am stress thinking about this plus we are being asked to do overtime during Saturday for 3 weeks so, I really don't have much time to do things for my family and my business.

0 Comments: